February 01, 2012

Man suspected climbed from the chann-skechers shoe

Man suspected climbed from the channel on railway viaduct repair staff in Yangcheng Evening News reporter Rao new, yellow-chou hui, correspondent Tam Yiu Kwong, Ding Lei photo coverage: August 10, 9 am, a new will be sent to Guangzhou Station South Station D7704 just getting out of the train station to run to the Jiangmen Jiangmen City, Ma Yuan road, a man (suspected mental illness) with a steel plate up the track and stay in the tracks on the plate, cause D7704 wheel-rail noise generated by train, shape ups-skechers, the train stopped immediately, skechers shoes, and then returned to the originating station Xinhui station. correspondents in the 10 morning received a tip lines rushed to the train parking place, I saw the vehicle parked in the Guangzhou-Zhuhai, Jiangmen branch rail Ma Park, Jiangmen City, the road section of the city rail, railway emergency has been rescue personnel and vehicles have been rushed to the scene. Under the rail viaduct in the city of Jiangmen Wuyi road, reporters saw more police cars roaring past, then there are two fire trucks parked in the railway over the road under the Wuyi, 12 firefighters used ladders to help Triassic and repair personnel, the police rose to 10 meters high from the ground to inspect and repair railway. 10:30, the fire road accident before the withdrawal, after still more than the railway track maintenance personnel and police officers in the patrol back and forth overhead bridge and the road surface of each pole.

correspondent in the city under the rail viaduct Dongsheng Road, Jiangmen Hi-tech Industrial Park, Shun Hing Plastic Factory interviewed plant security surnamed Zhang, shape up ballerina kicks, said that they plant in the city under the rail viaduct , how many trains a day after he clearly. At 8:00 on the 10th and more, a trip south of the new trains will be bound for Guangzhou opened after 9 o’clock, another trip No. D7704 door to stop the train had not yet reached the factory. When he stopped to see the car felt very strange, because in the past where the train never stop. He said he noticed D7704 train stopped half an hour later, to plant in front of a large number of police and firefighters, their city from the elevated rail tracks on the ground through a current and elevated urban rail maintenance escalator channel, will be a The 50-year-old topless men escorted down, is responsible for escorting one of the officers holding three thickness of about 0.8 cm of steel, these estimates turned out to be a single piece of steel plate, was pressed after the train is divided into three. Mr. Zhang said, D7704 did not train bound for Guangzhou South, about 10:27 timeshare back to the originating station Xinhui station.

correspondent saw, Shun Hing Plastic Factory gate across the road from the ground does have an escalator leading to the elevated railway tunnel, a road down from the elevated rescue workers said the train early group than D7704 The D7702 train pass by sound when the vehicle is found, D7702 train driver had heard a strange noise under the vehicle, it reported to the dispatch center. D7704 train travel to hear the sound here, so check the emergency stop down and found a piece of steel into between wheel and rail caused by drag brake, also saw a man lying naked in front of the upper edge of the track, then. Later, the vehicle maintenance staff to get out of the plate. To protect the safety of train operation, Guangzhou has also transferred to the professionals Jianghai along the road to check. According to the reporter, D7704 then fell back to the new train will stand maintenance.

10 afternoon, shape up skechers sale, the reporter received a Guangzhou-Zhuhai Rail sent a pass is issued, said officers pulled over by an unidentified city of Guangzhou-Zhuhai rail trains, affected, Guangzhou-Zhuhai track follow-up appear more trains 30-1 minutes or so late. Railway authorities launched emergency plans, through the station car radio informed reason to apologize to passengers on the train was late, and late follow-up to take the train operation adjustment. To 10 at 11 am, Guangzhou-Zhuhai city rail train order returned to normal.

Posted by: dieseljeans at 06:45 AM | No Comments | Add Comment
Post contains 712 words, total size 5 kb.

Comments are disabled. Post is locked.
12kb generated in CPU 0.0323, elapsed 0.3516 seconds.
33 queries taking 0.3432 seconds, 55 records returned.
Powered by Minx 1.1.6c-pink.