January 30, 2012

separated-skechers rocky point flip flops australia

These days, there have been Yangjia Chun Xiao Southview residents to the newspaper reflected: the west side there is a residential construction site, in the course of the excavation area of ​​the ground caused by cracking, tilt wall, above the tiles began to fall off. More serious is the area of ​​the house there is a problem, and some cracks in the walls and stairs. reporter saw in the west district, six does exist on the ground next to large and small cracks, some cracks can be inserted into a fist, this crack has been extended to seven nearby. In a covered open-air parking lot rain cloth, turn the rain cloth, you can see there is also the cracks, more than the bare, scetchers shape ups, exposed serious cracks, roadbed some sink. Mr. Fan told reporters that the security community, in order to prevent storm erosion surface, shape up shoes, the cracks increase the roadbed, so covered with rain in the above cloth. green and then further down to go outside, there is an iron railing fence. Some off the wall above the tiles, there are also some broken fences, walls tilt outwards the whole bit. Next to roads and parking, is a construction site, construction has stopped. Owners, shape ups-skechers, Mr. Zhang said: 10 days or so, Yangjia Chun Xiao Southview residents discovered the problem. owners agreed that the construction site is next to the settlement resulting from the excavation of the pit, they did not do the construction of protective measures, resulted in substantial loss of mud, so the area where these problems now appear. Looked next to the site, residential property owners who are all worried about my heart: If you do not timely and effective protective measures, skechers rocky point flip flops australia, in accordance with this trend, crack growing, to the time the road will collapse? House will appear larger problem?

owners hope to be processed as quickly as possible, so that the ground will not sink, simultaneous detection of Yangjia Chun Xiao Nanyuan the framework structure of the building was not damaged, the house is a security risk. a Ki in the construction work, said: next to the construction, the designer should take into account the envelope with the cell-binding site of the pile to strengthen measures, because some places relatively poor geological conditions, digging down deep layer of generally muddy soil, silt soil plasticity is poor, if design of the envelope did not take into account the pit outside the pile load situation, there will be the same as the phenomenon of the district. >

Posted by: dieseljeans at 08:18 AM | No Comments | Add Comment
Post contains 438 words, total size 3 kb.

Comments are disabled. Post is locked.
11kb generated in CPU 0.0069, elapsed 0.0826 seconds.
33 queries taking 0.0777 seconds, 55 records returned.
Powered by Minx 1.1.6c-pink.